NITI Aayog ATL Framework

Atal Tinkering Lab turnkey infrastructure and statutory compliance

Every bench specification and component list complies strictly with NITI Aayog benchmarks before arriving on site. We deliver audit-ready installations designed to pass regulatory inspection on first submission.

an abstract photo of a curved building with a blue sky in the background


Package 1: Electronics, IoT & Sensors

Arduino Uno/Mega, ESP32, Raspberry Pi, 30+ sensor varieties (Ultrasonic, IR, DHT, Gas, RFID), relay modules, and actuator sets.

Package 2: Rapid Prototyping (3D Printing)

Industrial FDM 3D printer (220×220×250mm), PLA/ABS spools, 3D modeling pen sets, digital calipers, and heat bed accessories.

Package 3: Mechanical Tools & Stations

Temperature-controlled soldering stations, digital multimeters, wire strippers, motorized mini drills, and custom tool shadow boards.

Package 4: Safety & Power Bench

ESD-safe anti-static mats, emergency eyewash, industrial first-aid stations, chemical fire extinguishers, and MCB power racks.

Turnkey ATL Setup Packages

Includes 45-day SLA, on-site commissioning & teacher certification
Equipment Schedules

Standardized laboratory component packages

Curriculum-aligned hardware configurations tailored for verified secondary school science and technology curricula.

Package 01
Package 02
Package 03

Electronics and Sensors

Rapid Prototyping

Mechanical Workbenches

Microcontrollers, IoT sensor modules, breadboards, power supply units, and discrete components meeting official NITI Aayog guidelines.

Enclosed 3D printers, filament bundles, digital calipers, and safety enclosures certified for institutional deployment.

Heavy-duty modular work tables, hand tool kits, precision storage cabinets, and ergonomic student seating configurations.

Statutory Workflow

Four-stage commissioning methodology

01
02
03
04

Grant allocation sanction

PFMS financial mapping

Physical commissioning

NITI portal upload

Review of sanction orders, verification of fund disbursement rules, and initial milestone planning with school administration.

Integration of Public Financial Management System accounting schedules and vendor mapping for transparent auditing.

On-site delivery, workbench assembly, tool calibration, and safety compliance certification by technical supervisors.

Compilation of utilization certificates, geo-tagged completion verification, and final submission paperwork.

Inquire about complete ATL commissioning schedules

Connect with our institutional directorate desk to discuss grant timelines, GeM procurement options, and detailed cost estimates.